Thursday, March 04, 2010 @ 9:45:00 AM - Written by Ann Kelly - 1 comments
We had a good week for siding on #6. Everything but the two gables on the Boyd Acres side is done. Inside the insulation is done and a good deal of the sheet rock.
Porches were being built on #8 and #14. This involved a whole lot of concrete for the porch posts, removing one set of roof trusses and lowering them. There are attractive, heavy beams going up too.
Volunteers started roofing #8 and all but the garage roof is done on #14. Having the support hardware for solar panels in place on #14 makes it look as if things are really moving.
Our break tent moved. We had to clear the space for excavation for the last 5 houses. But doughnuts arrived without interruption. Thankfully.
Porches were being built on #8 and #14. This involved a whole lot of concrete for the porch posts, removing one set of roof trusses and lowering them. There are attractive, heavy beams going up too.
Volunteers started roofing #8 and all but the garage roof is done on #14. Having the support hardware for solar panels in place on #14 makes it look as if things are really moving.
Our break tent moved. We had to clear the space for excavation for the last 5 houses. But doughnuts arrived without interruption. Thankfully.