Wednesday, May 19, 2010 @ 4:31:00 PM - Written by Ann Kelly
The weather was good this week with only occasional rain. We put together porch frames. The cedar decking will be built much closer to move-in. There were porches front, back and garage side on # 8. Inside Joe was doing mudding and taping.
Caulking was done on Roberto and Maria's house - # 5. Porch posts were trimmed on # 5, # 6 and # 7. There was a little side porch put on # 6. The kitchen cabinets are going into # 6.
We moved the kitchen window framing on # 18 and did the chop list for windows and doors so the ladies can come on Saturday and work on the walls for the second floor.
It sounds like odds and ends but it was all necessary work.
Caulking was done on Roberto and Maria's house - # 5. Porch posts were trimmed on # 5, # 6 and # 7. There was a little side porch put on # 6. The kitchen cabinets are going into # 6.
We moved the kitchen window framing on # 18 and did the chop list for windows and doors so the ladies can come on Saturday and work on the walls for the second floor.
It sounds like odds and ends but it was all necessary work.